Free Construction Estimating Templates and Playbooks
Battle-tested construction estimating templates, checklists and playbooks that GCs and subcontractors use to bid more work with a dedicated estimator.
Pick Your Playbook
Filter by category or browse all. Every resource opens instantly in the reader — no sign-up, no download, 100% free.
Bluebeam Revu Shortcut Cheat Sheet
Every keyboard shortcut your estimator needs to run takeoffs 2x faster. Print-ready, one page.
Bid Package & Takeoff Template
Fully-built Excel template for material takeoffs, scope sheets, and subcontractor bid leveling.
Sample Estimate — Community Centre
A real takeoff sample prepared by Get Ninja estimators. 9-division breakdown, $9.2M community centre with full material, labor, and trade costs.
Business Deconstruction Framework
Map every role, process, and bottleneck in your business on one page. The framework our clients use on Day 1.
5-SOP Estimating Starter Pack
Fill-in-the-blank SOPs for the five steps every bid runs through, from ITB intake to bid-day submission.
Estimator Performance KPI Dashboard
Track bids submitted, on-time rate, takeoff turnaround and hit rate in one clean Google Sheet.
The Bid Workload Matrix
Sort every bid task into keep, hand off, standardize or cut, and see exactly what your estimator should own.
30-Day Construction Estimator Onboarding Checklist
Week-by-week plan to get your new estimator bidding live jobs in 30 days: software, pricing, past bids and first submissions.
The Contractor's Estimating Handoff Playbook
The framework we use to take general contractors and subcontractors out of takeoffs, bid prep and sub follow-ups in under 30 days.
The Remote Construction Estimator Onboarding Kit
Everything you need to get a pre-trained construction estimator bidding your live jobs within 30 days, without dropping the ball on active bids.
- 30-day onboarding plan (week-by-week)
- 5 estimating SOPs, from ITB intake to bid day
- Sample bid package & takeoff examples
- Estimator KPI tracker (Google Sheets)
- Bid workload matrix
Ready to stop building — and start scaling?
Book a free discovery call and we'll map out exactly which bids and takeoffs your dedicated Get Ninja estimator can take off your plate.
Book A Discovery CallBluebeam Revu Shortcut Cheat Sheet
Every keyboard shortcut your estimator needs to run takeoffs 2× faster.
Navigation & View
| Shortcut | Action |
|---|---|
| Ctrl + 0 | Fit page to window |
| Ctrl + 1 | Actual size (100%) |
| Ctrl + 2 | Fit width |
| Ctrl + + | Zoom in |
| Ctrl + - | Zoom out |
| Spacebar | Pan tool (hold) |
| Ctrl + G | Go to page |
| F11 | Full screen |
| Z | Loupe tool |
Measurement Tools (Takeoff)
| Shortcut | Action |
|---|---|
| L | Linear measurement |
| A | Area measurement |
| V | Volume measurement |
| C | Count measurement |
| P | Perimeter |
| D | Diameter |
| Alt + M | Measurement properties |
| Shift + L | Polyline measurement |
| Shift + A | Polygon area |
Markup & Annotation
| Shortcut | Action |
|---|---|
| T | Text box |
| N | Note / callout |
| H | Highlight |
| R | Rectangle |
| E | Ellipse |
| I | Image / stamp |
| Ctrl + K | Hyperlink |
| Ctrl + Shift + M | Markups list |
File & Document
| Shortcut | Action |
|---|---|
| Ctrl + S | Save |
| Ctrl + Shift + S | Save as |
| Ctrl + P | |
| Ctrl + F | Find text |
| Ctrl + Shift + F | Find in folder |
| Ctrl + B | Bookmark panel |
| Ctrl + T | Thumbnails panel |
| Ctrl + W | Close document |
Want a dedicated estimator on your team who already knows all this?
Book A Discovery Call →Bid Package & Takeoff Template
The exact structure Get Ninja estimators use for material takeoffs, scope sheets, bid leveling, and final pricing. Build it in Excel, Google Sheets, or any estimating tool.
The 8-Tab Structure
A complete bid workbook has 8 tabs. Each plays a specific role in the estimate-to-submission workflow:
| # | Tab | Purpose |
|---|---|---|
| 1 | Project Info | Owner, GC, bid deadline, scope summary, inclusions/exclusions |
| 2 | Scope Sheet | CSI MasterFormat divisions with included/excluded flags |
| 3 | Takeoffs | Material quantities with auto-calculated waste and extended cost |
| 4 | Labor | Crew composition, hours, rates, burden factor |
| 5 | Sub Quotes | RFQs sent, quotes received, bid leveling |
| 6 | Summary | Direct costs + overhead + profit + contingency = total bid |
| 7 | Cover Sheet | Printable branded cover for submission |
| 8 | Instructions | How to use — for handoff to a new estimator |
Tab 1 — Project Info Fields
- Project Name, Number, Address
- Owner/Developer, General Contractor, Architect, Engineer
- Bid Deadline, Start Date, Completion Date
- Contract Type (Lump Sum / GMP / T&M)
- Project Type (Residential / Commercial / Industrial)
- Square Footage, Number of Stories, Estimated Value
- Scope Summary (2-3 sentences)
- Inclusions, Exclusions
Tab 2 — CSI MasterFormat Scope Sheet
Standard 23 divisions to check off included/excluded work:
| Division | Description |
|---|---|
| 01 | General Requirements |
| 02 | Existing Conditions |
| 03 | Concrete |
| 04 | Masonry |
| 05 | Metals |
| 06 | Wood, Plastics, Composites |
| 07 | Thermal & Moisture Protection |
| 08 | Openings |
| 09 | Finishes |
| 21 | Fire Suppression |
| 22 | Plumbing |
| 23 | HVAC |
| 26 | Electrical |
| 31 | Earthwork |
| 32 | Exterior Improvements |
| 33 | Utilities |
Tab 3 — Takeoffs Formula
For each material line item, the extended cost formula is:
Example: 500 LF of 2x4 @ $1.25/LF with 10% waste = 500 × 1.25 × 1.10 = $687.50
Required columns: Item # / Description / Unit / Quantity / Unit Cost / Waste % / Extended Cost / Notes
Tab 4 — Labor Formula
Default burden factor: 28% (covers payroll taxes, workers comp, benefits, PTO).
Example: 3-man crew × 40 hrs × $35/hr × 1.28 = $5,376
Tab 5 — Sub Quote Bid Leveling
To compare quotes on a like-for-like basis:
| Column | Purpose |
|---|---|
| Trade | Electrical, Plumbing, HVAC, etc. |
| Sub Name | Company bidding |
| Quote $ | As submitted |
| Scope Complete? | Yes / No |
| Qualified? | Licensed, bonded, insured |
| Adjustment $ | Add missing scope, subtract excess |
| Leveled Quote | Quote + Adjustment — this is what you compare |
Tab 6 — Summary Markup Formula
Standard markups:
• Overhead: 10-15% of direct costs
• Profit: 6-10% (commercial) or 10-20% (residential)
• Contingency: 2-5% on direct costs
Key Estimating Ratios to Remember
- Concrete waste: 5-8%
- Lumber waste: 8-12%
- Drywall waste: 8-10%
- Shingle waste: 10-15%
- Rebar waste: 5-10%
- Burden factor: 25-35% (labor)
- 1 cubic yard: 27 cubic feet
- 1 square of roofing: 100 sq ft
Want a dedicated estimator on your team who already knows all this?
Book A Discovery Call →The Business Deconstruction Framework
Map every role, process, and bottleneck in your business on one page. The framework Get Ninja clients use on Day 1.
Why Most Businesses Can't Scale
It's almost never because the founder isn't smart enough or the team isn't working hard enough. It's because no one — including the founder — has written down how the business actually works.
When the business only exists inside the founder's head, the founder becomes the bottleneck for every decision, every hire, every client. Growth stalls at whatever revenue the founder's bandwidth allows.
The 6 Domains
| Domain | What You'll Map | Output |
|---|---|---|
| 1. Revenue | Offers, pricing, sales process | Revenue map |
| 2. Delivery | Workflows, SOPs, quality checks | Delivery blueprint |
| 3. Operations | Tools, data, admin, finance | Tool & owner matrix |
| 4. People | Org chart, roles, KPIs | Accountability chart |
| 5. Marketing | Lead channels, content, funnel | Lead gen map |
| 6. Strategy | North star, goals, priorities | Strategy on a page |
Domain 1 — Revenue
Map every offer, its price, its revenue share, and the exact steps between stranger and paying customer.
- What are your core offers, and what % of revenue does each drive?
- What's the price of each — flat, tiered, custom?
- How does a stranger become a lead?
- How does a lead become a paying customer? (List every step)
- What's your average close rate? Average time to close?
- What's your churn rate? How do you retain clients?
- Which offers are actually profitable vs vanity revenue?
Domain 2 — Delivery
The single biggest source of founder bottleneck. If it's not written, it's not a process — it's tribal knowledge.
- What happens in the first 24 hours after a client signs?
- What's the onboarding sequence? Who owns each step?
- What's the delivery workflow? List every handoff.
- Who does quality control? How?
- What's the escalation path when something breaks?
- How do clients communicate with your team?
- What SOPs exist today? Which ones are only in your head?
Domain 3 — Operations
Tools, data, admin, finance. Every tool should have an owner, a backup, and documented credentials.
- What tools do you use? (SaaS, internal, scripts)
- Who is the owner of each tool? Who's the backup?
- Where are credentials stored? Who has access?
- How is data backed up? How often?
- What does your month-end close process look like?
- Who handles invoicing? Collections? Payroll?
- What happens if the owner of any tool disappears tomorrow?
Domain 4 — People
Not a hierarchy diagram — an accountability chart. Every seat has one person accountable, responsibilities, and 3-5 KPIs.
- What seats exist in your business today? (seats, not people)
- Who sits in each seat?
- What is each seat accountable for? (3-7 outcomes)
- What are the 3-5 KPIs for each seat?
- Where are the unfilled seats blocking growth?
- Which seats should the founder NOT be in 6 months from now?
- Who reports to whom? (only one direct manager per person)
Domain 5 — Marketing
Where your best clients come from. Build the map, then invest intelligently instead of chasing tactics.
- What are your top 3 lead sources today? By volume? By quality?
- What's your cost per lead by channel?
- What's your conversion rate from lead to customer by channel?
- Which content assets drive the most inbound interest?
- What's your brand positioning in one sentence?
- Who is your ideal client profile? Be specific.
- What's missing from your marketing that you know works?
Domain 6 — Strategy
The last domain, but it sits on top of everything. Without clarity, the machine runs fast in the wrong direction.
- What is your 3-year vision?
- What are your 1-year goals? (financial, operational, team)
- What are your 90-day priorities? (3 max)
- What are you NOT doing in the next 90 days?
- What's the biggest constraint on growth right now?
- What's the one thing that, if solved, makes everything else easier?
- What does a healthy quarter look like 12 months from now?
Want a dedicated estimator on your team who already knows all this?
Book A Discovery Call →The 5-SOP Estimating Starter Pack
Fill-in-the-blank SOPs for the five steps every bid runs through, from ITB intake to bid-day submission. Copy, customize, and hand them to your estimator.
How To Use
Each SOP follows the same 6-section template: purpose, trigger, tools, steps, quality checks and escalation. Copy them into your shared drive or project tool, fill in your trade, markup rules and preferred subs, and assign an owner. Together they cover a bid from the moment the invitation lands to the follow-up after bid day.
SOP #1: Bid Intake & Go/No-Go
Purpose
Log every invitation to bid, decide quickly whether it is worth pricing, and get accepted bids onto the bid calendar with a clear owner and due date.
Trigger
An ITB, RFP or plan-room invite arrives (email, BuildingConnected, PlanHub, ConstructConnect or direct from a GC).
Tools Required
- Bid calendar / bid board
- Bid log spreadsheet
- Go/no-go scorecard
- Plan room logins
Step-by-Step Process
- Log the invite the same day: project, GC/owner, location, trade scope, bid due date and time, walk-through date.
- Download the full bid set: drawings, specs, addenda and bid forms.
- Score the bid on the go/no-go scorecard: scope fit, project size, location, GC relationship, schedule, competition and bonding.
- Send the score to the owner for a yes/no within 24 hours.
- If yes, add it to the bid calendar with internal deadlines: takeoff done, quotes due, pricing review, submission.
- If no, send a polite decline to the GC so you stay on their bid list.
- Set up the project folder from the standard bid template.
Quality Checks
- No invite sits unlogged for more than 1 business day
- Every accepted bid has internal deadlines, not just the due date
- Declines go out, never silence
Escalation
If the bid set is incomplete or the due date doesn't leave enough time to price it properly, flag it to the owner the same day.
SOP #2: Quantity Takeoff & QA
Purpose
Produce an accurate, organized quantity takeoff for the scope you are pricing, and catch errors before they reach the number.
Trigger
Bid accepted and bid set downloaded.
Tools Required
- Takeoff software (Bluebeam Revu, PlanSwift, STACK or similar)
- Takeoff template with your item codes
- Spec sections for your division
- Addenda log
Step-by-Step Process
- Read the specs and general notes for your division before measuring anything.
- Set and verify the scale on every sheet.
- Run the takeoff by area or system, using your standard item codes and color layers.
- Mark up every measured item on the drawings so the takeoff can be audited.
- Apply waste factors from your written standards, not from memory.
- Log every assumption, exclusion and RFI question in the scope notes.
- Check all addenda and update quantities before pricing.
- Run QA: spot-check 3 to 5 major items with a second measurement or a rule-of-thumb check.
Quality Checks
- Scale verified on every sheet
- Every quantity traceable to a markup
- Spot-check variance within the tolerance you set (for example, ±2%)
- All addenda acknowledged and incorporated
Escalation
If drawings conflict with specs, or a scope gap could swing the number, send the RFI question to the owner before the RFI deadline.
SOP #3: Subcontractor & Supplier Quote Request
Purpose
Solicit, track and organize sub and supplier quotes so every scope has competitive coverage before pricing.
Trigger
Scope packages are defined for the bid.
Tools Required
- Bid package with drawings and scope sheets
- Sub and supplier database
- RFQ email template
- Quote tracking sheet
Step-by-Step Process
- Identify 3 to 5 qualified subs or suppliers per scope.
- Send the standard RFQ with scope, drawings, specs, quote due date and required format.
- Log each RFQ with a timestamp.
- Follow up on Day 3 with anyone who hasn't confirmed they are bidding.
- Send a reminder 48 hours before quotes are due.
- On the due date, collect quotes and flag any scope with fewer than 3.
- File every quote in the project folder.
Quality Checks
- Minimum 3 qualified quotes per scope
- Every RFQ gets a confirm, decline or follow-up
- Quotes arrive in time for leveling, not on bid day
Escalation
If any scope has fewer than 3 quotes 48 hours before the due date, flag it to the owner so you can plug the number or self-perform.
SOP #4: Bid Leveling & Pricing Build-Up
Purpose
Compare quotes like-for-like and build the final number from quantities, labor, quotes and markup.
Trigger
Takeoff complete and sub quotes received.
Tools Required
- Bid leveling sheet
- Pricing database or current supplier price lists
- Labor rates and burden factor
- Markup standards
Step-by-Step Process
- Enter each quote into the leveling sheet with its inclusions and exclusions.
- Adjust for missing or extra scope so every quote compares like-for-like.
- Price self-performed work: quantities × unit costs, plus labor hours × burdened rate.
- Add general conditions, equipment and any allowances.
- Apply overhead, profit and contingency per your markup standards.
- Write the bid qualifications: inclusions, exclusions, assumptions and alternates.
- Send the summary to the owner for pricing review at least 24 hours before the bid is due.
Quality Checks
- No unleveled quotes in the final number
- Math checked by a second set of eyes
- Exclusions match the scope notes from the takeoff
Escalation
If the leveled number is far off your historical cost per unit for similar work, flag it before review. Something is missing or double counted.
SOP #5: Bid Submission & Post-Bid Follow-Up
Purpose
Submit complete, compliant bids on time, then track the result so every bid improves the next one.
Trigger
The owner approves the final number.
Tools Required
- Bid forms and proposal template
- Bid log
- Submission portal or GC email
Step-by-Step Process
- Fill in the bid form exactly as requested: base bid, alternates, unit prices and addenda acknowledgment.
- Attach the proposal with qualifications and exclusions.
- Submit at least 2 hours before the deadline and get a receipt or confirmation.
- Update the bid log with the amount and the date and time submitted.
- Follow up with the GC 3 to 5 business days after bid day.
- Record the result (won, lost or pending), with the winning number if you can get it.
- Log one lesson learned per bid.
Quality Checks
- Zero late bids
- Every addendum acknowledged on the form
- Every bid has a recorded result within 30 days
Escalation
If the portal fails or a required form is missing within 4 hours of the deadline, call the GC and the owner immediately.
Want a dedicated estimator on your team who already knows all this?
Book A Discovery Call →Estimator Performance KPI Dashboard
The KPI framework Get Ninja uses to track an estimator's bid volume, turnaround, takeoff accuracy and hit rate. Build it in any spreadsheet tool in 15 minutes.
Why Track Estimator KPIs
Estimators struggle for two reasons: (1) no one told them what a good week looks like, or (2) no one was measuring. A KPI dashboard solves both. When your estimator knows before they start that they are measured on bids out the door, on-time submissions and takeoff accuracy, performance goes up.
The dashboard has three parts: a bid log, weekly targets and a monthly review.
The 6 Core KPIs
| KPI | Target | Why It Matters |
|---|---|---|
| Bids submitted per week | Set by trade and bid size | Bid volume and pipeline coverage |
| On-time bid rate | 100% | A late bid is a lost bid |
| Takeoff turnaround | Agreed days per bid size | Leaves time for quotes and pricing review |
| Takeoff accuracy (QA variance) | Within your tolerance, e.g. ±2% | Protects your margin |
| Sub quote coverage | 3+ quotes per scope | Keeps pricing competitive |
| Bid-hit rate | Track the trend monthly | Shows whether you are bidding the right work |
Bid Log Template
Your estimator fills out one row per bid. This is the raw data that drives everything else:
| Column | What to Enter |
|---|---|
| Project | Project name and number |
| GC / Owner | Who you are bidding to |
| Division / Scope | CSI division or trade scope |
| Received | Date the ITB arrived |
| Due | Bid due date and time |
| Takeoff Done | Date the takeoff was finished |
| Turnaround | Takeoff Done minus Received, in days |
| Quotes Received | Lowest number of quotes on any one scope |
| QA Variance | Spot-check variance from takeoff QA |
| On Time? | Yes / No |
| Bid Amount | Final submitted number |
| Result | Won / Lost / Pending |
| Notes / Lessons | Scope misses, pricing gaps, GC feedback |
Dashboard Formulas
Once the Bid Log is set up, these formulas drive the KPI cards at the top of the dashboard:
=COUNTIFS(Bid_Log[Due],">="&WeekStart,Bid_Log[Due],"<"&WeekStart+7)On-Time Bid Rate:
=COUNTIF(Bid_Log[On Time?],"Yes")/COUNTA(Bid_Log[On Time?])Avg Takeoff Turnaround (days):
=AVERAGE(Bid_Log[Turnaround])Bid-Hit Rate:
=COUNTIF(Bid_Log[Result],"Won")/(COUNTIF(Bid_Log[Result],"Won")+COUNTIF(Bid_Log[Result],"Lost"))Status Flag:
=IF(Actual >= Target, "✓ On Track", "✗ Off Track")For turnaround and QA variance, flip the comparison (lower is better).
Weekly Bid Review Template
Every week, you and your estimator walk through 5 conversations. Keep this slot on the calendar. Skipped check-ins are where scope misses and wrong assumptions slip into bids.
- Bid board. What is due in the next two weeks? Anything we should drop or add?
- Results. Which bids did we win or lose, and why? What was the winning number?
- Stuck bids. Missing drawings, thin quote coverage, open RFIs. Who unblocks them?
- Pricing updates. Material price changes, new labor rates and sub feedback to add to the pricing database.
- Training needs. What spec section, software feature or trade knowledge would make the next bid faster?
Diagnostics Section
Pull these metrics monthly to spot patterns:
- Hit rate by GC or client: who actually awards you work
- Hit rate by project size and type: where your pricing is competitive
- Late or rushed bids: a sign of intake and calendar problems
- Scopes with thin quote coverage: where your sub list needs work
- Bids with no recorded result: a sign follow-up is slipping
Want a dedicated estimator on your team who already knows all this?
Book A Discovery Call →The Bid Workload Matrix
A 2×2 matrix for contractors buried in bids. Sort every estimating task into keep, hand off, standardize or cut, in under 60 seconds per task.
The Matrix
Every task in your bid process falls into one of four quadrants based on two questions:
- How much time does it take per bid? (hours of takeoff, data entry, follow-up)
- How much does it affect whether you win profitable work? (accuracy, pricing, relationships)
The quadrant tells you who should own it.
| Low Impact | High Impact | |
|---|---|---|
| High Time | 🗑️ CUT Hours that don't move the number: bidding jobs you rarely win, redoing takeoffs from scratch on every revision, retyping quotes. Fix the process or stop. |
⚡ HAND OFF The heavy lifting behind every bid: takeoffs, scope sheets, sub outreach and bid leveling. This is what a dedicated estimator owns. |
| Low Time | 🤖 STANDARDIZE Small repeat tasks: ITB acknowledgments, bid calendar entries, file naming, folder setup. Use templates and simple automations. |
🛡️ KEEP Owner-level calls: bid/no-bid decisions, final markup, GC and owner relationships, final sign-off. Only you should make these. |
Score Your Current Tasks
List the 15 estimating and bid tasks that take the most of your time this month. Score time (1-5) and impact on winning work (1-5). Plot them on the matrix.
Scoring Guide
- Time 1: Under 15 minutes per bid
- Time 3: About 2 hours per bid
- Time 5: A full day or more per bid
- Impact 1: The bid result is the same whether or not this is done well
- Impact 3: Done badly, it costs you some bids or some margin
- Impact 5: Done badly, it loses the job or wins it at a loss
Task Worksheet
| # | Task | Time | Impact | Quadrant | Owner |
|---|---|---|---|---|---|
| 1 | — | — | — | — | — |
| 2 | — | — | — | — | — |
| ... | Continue for 15 total tasks |
Quadrant Actions Explained
🛡️ KEEP (Low Time, High Impact)
These are the calls only you can make: which bids to chase, what margin to carry, how to handle a GC relationship, and whether the number is right before it goes out. They don't take long, but they decide whether you win profitable work. Keep them, and protect the time to make them well.
⚡ HAND OFF (High Time, High Impact)
The highest-ROI quadrant. Takeoffs, scope sheets, sub and supplier RFQs, bid leveling and the pricing build-up all need skill and accuracy, but not owner-level judgment. This is the work a dedicated, division-specific estimator owns, while you review the summary and make the final call.
🤖 STANDARDIZE (Low Time, Low Impact)
These shouldn't need anyone's judgment. Examples: acknowledging ITBs, adding bids to the calendar, naming files, setting up project folders and sending standard RFQ reminders. Turn them into templates, checklists or simple automations so they happen the same way every time.
🗑️ CUT (High Time, Low Impact)
The quadrant that quietly eats your week: pricing jobs outside your sweet spot, chasing GCs who never award, rebuilding a takeoff from scratch when an addendum changes two sheets, and retyping quotes into spreadsheets. Set go/no-go criteria, keep takeoffs organized by area, and stop work that doesn't change the result.
Want a dedicated estimator on your team who already knows all this?
Book A Discovery Call →The 30-Day Construction Estimator Onboarding Checklist
A week-by-week plan to get your new estimator bidding live jobs at full speed in 30 days. The same playbook Get Ninja uses with every client placement.
Why 30 Days Matters
Most failed estimator placements go wrong in the first 14 days. Usually the estimator could do the work, but nobody showed them how this company bids: its markup, its exclusions, its subs, its pricing. The contractor sends over a few plan sets, expects finished numbers, and three weeks later the bids are late or missing scope.
This checklist prevents that. Every task is assigned to YOU (owner or chief estimator) or ESTIMATOR (your new estimator). Check each box. If you fall behind, pause new bids until you catch up.
Week 1 — Foundation
Day 1 — Kickoff & Access
- ☐ YOU: 30-minute kickoff: your trades, CSI divisions, typical project types and bid sizes
- ☐ YOU: Grant access: takeoff and estimating software, plan rooms, shared drive, email, bid calendar
- ☐ YOU: Share your preferred subs and suppliers list
- ☐ ESTIMATOR: Confirm every login and software license works; send a screenshot of the setup
- ☐ ESTIMATOR: Set up the time tracker and start logging
Day 2 — How You Bid
- ☐ YOU: Share 3 to 5 past bids, won and lost, with the final numbers
- ☐ YOU: Walk through your markup, labor rates, burden factor and standard exclusions
- ☐ ESTIMATOR: Review every past bid and write down how the number was built
- ☐ ESTIMATOR: End of day: send 5 questions about anything unclear
Day 3 — Pricing & Templates
- ☐ YOU: Share your pricing database, supplier price lists and estimating templates
- ☐ YOU: Share the 5-SOP Estimating Starter Pack, or your own bid SOPs
- ☐ ESTIMATOR: Map your templates to the five bid steps: intake, takeoff, quotes, leveling, submission
- ☐ ESTIMATOR: Flag any gaps in the templates; don't work around them silently
Day 4 — Practice Takeoff
- ☐ YOU: Pick a past project you already bid
- ☐ ESTIMATOR: Run the takeoff blind, without seeing your original numbers
- ☐ YOU: Compare quantities line by line against your original takeoff
Day 5 — Feedback & Bid Log
- ☐ YOU: Review the variance from Day 4 and give specific feedback
- ☐ YOU: Set up the bid log and KPI dashboard
- ☐ ESTIMATOR: Start logging every bid in the bid log; this becomes a daily habit
Week 2 — Supervised Live Bids
Day 8 — First Live Takeoff
- ☐ ESTIMATOR: Run the takeoff on a live bid with scope notes and RFI questions
- ☐ YOU: Review the takeoff before any pricing starts
Day 9 — Sub & Supplier Outreach
- ☐ ESTIMATOR: Send RFQs for the live bid using your templates and sub list
- ☐ YOU: Introduce your estimator to your key subs and suppliers
Day 10 — Leveling Together
- ☐ ESTIMATOR: Level the quotes and build the first pricing summary
- ☐ YOU: Walk through the leveling sheet together; explain every adjustment you would make
Day 11 — Weekly Check-In
- ☐ YOU: 30-minute weekly check-in: bid board, stuck items, questions
- ☐ YOU: Keep this slot every week; skipped check-ins are where scope misses slip into bids
Day 12 — First Bid Out
- ☐ ESTIMATOR: Prepare the bid form, proposal and exclusions
- ☐ YOU: Review and sign off; the bid goes out with your approval
Week 3 — Independence
Days 13-14
- ☐ ESTIMATOR: Own takeoffs and sub outreach on 2 or more bids at once
- ☐ YOU: Review pricing summaries only; answer questions within 4 hours
Day 15 — Midpoint Check
- ☐ YOU: Midpoint review: takeoff accuracy, turnaround, any scope misses?
- ☐ YOU: If off track, diagnose it: unclear standards, missing pricing data or a trade-knowledge gap?
- ☐ ESTIMATOR: Give honest feedback on what is slowing you down
Days 16-18
- ☐ ESTIMATOR: Run the bid calendar: intake, go/no-go scorecards and internal deadlines
- ☐ YOU: Move from reviewing every takeoff to spot-checking them
Days 19-20 — KPIs Live
- ☐ YOU: Set targets for bids per week, turnaround, on-time rate and QA variance
- ☐ ESTIMATOR: Report KPIs in the weekly check-in
Week 4 — Ownership
Days 21-25
- ☐ ESTIMATOR: Run the full bid load independently; flag exceptions only
- ☐ YOU: Weekly check-in plus final pricing sign-off; no daily reviews unless asked
- ☐ ESTIMATOR: Suggest at least one improvement to a template or SOP
Days 26-29
- ☐ YOU: Add the next layer: a second division, larger bids or post-bid follow-up
- ☐ ESTIMATOR: Take one bid end to end, from ITB to recorded result
Day 30 — Graduation Review
- ☐ YOU: 30-day review: hitting the targets? Ready to run your bid calendar?
- ☐ YOU: If yes, expand the scope. If no, diagnose the gap or request a replacement.
- ☐ ESTIMATOR: Self-assessment: what went well, and what is still unclear?
Success Criteria — What "Done" Looks Like on Day 30
- ☐ Your estimator owns takeoffs, sub outreach and leveling for your standard bid types
- ☐ Zero late bids in the last two weeks
- ☐ Takeoff spot checks are within the variance you set
- ☐ The bid log is current, with results recorded
- ☐ You spend less than 30 minutes a day on estimating outside final sign-off
- ☐ Your estimator can explain your markup, exclusions and go/no-go criteria in their own words
- ☐ The weekly check-in is about the pipeline, not fixing mistakes